Technicians in hard hats rigging and positioning heavy equipment on site
Service

From foundation to first fire — a boiler that is set, piped, tested and handed over properly.

Overview

Correct installation decides how safely and efficiently a boiler will run for the rest of its life. Our teams handle rigging and placement, pipework, mountings, burner and electrical connections, then commission the plant with your operators.

Scope of work

01

Site survey & planning

Access, foundations, flue route, utilities and tie-in points confirmed before equipment arrives.

02

Rigging & erection

Safe placement of the boiler and auxiliaries with alignment and levelling.

03

Piping & connections

Steam, feed water, blowdown, fuel and flue connections completed and tested.

04

Commissioning

Safety-device checks, burner set-up, controls testing and a monitored first run.

05

Operator handover

Practical training on start-up, shut-down, blowdown and daily checks.

What you receive

  • Installation checklist
  • Commissioning records
  • Operating guidance
  • Spare-parts recommendations
Related services

Technician servicing hot industrial equipment amid steam
Service 02

Preventive Maintenance

Scheduled care that keeps boilers efficient, compliant and available when production needs them.

Service details
Engineering general-arrangement drawing of a water tube boiler
Service 04

Engineering & Design Support

Load studies, equipment selection and upgrade engineering for new and existing steam plants.

Service details
Start a project

Share your required output, pressure, fuel and site details. Our engineers will recommend the right equipment and prepare a proposal.